Teoh Han Hui's DMC Assignment
Thursday, September 29, 2011
Some updates
Design, design, design... (System design)
Time is running out.
Tasks completed
Switched to tabbed interface (JTabbedPane)
Able to write out static images to file
To-do
Create 3 filters each for point and neighbourhood operations
Construct and draw the 3 types of histogram
Wednesday, September 28, 2011
Filters and histogram
Start creating filters.
Tasks completed
Built a multi-document GUI with smart sizing of internal windows
Able to load and display static images
To-do
Create 3 filters each for point and neighbourhood operations
Construct and draw the 3 types of histogram
Wednesday, September 14, 2011
Start coding soon
All preparations done.
Tasks completed
Installed and configured EGit plugin for Eclipse
Performed initial push to repository from the local machine
To-do
Build a basic GUI
Load and display image
Friday, September 9, 2011
Start
Getting started on the assignment today.
Tasks completed
Chose
Git
as the version control system to use
Created a free account and private repository on
Unfuddle
To-do
Install and configure EGit plugin for Eclipse
Perform initial push to repository from the local machine
Newer Posts
Home
Subscribe to:
Posts (Atom)